Asphalt Paving in Fargo, ND

Paving work covers new and replacement asphalt driveways and small lots, built from the subgrade up, and around Fargo the base, more than the surface, sets how long the result lasts, because the city's frost line sits at 52 inches and the clay underneath holds water. Asphalt driveway installation starts with excavating soft soil, building up the gravel base in compacted layers, then spreading and rolling the hot mix, and a paving contractor working on wet lake-plain clay often has good reason to build that base thicker than the textbook minimum. Timing matters as much, because hot mix is easiest to place and compact from May through September here. For a sound older drive that only needs protection, see driveway sealcoating.

Typical Fargo price

$5 - $15 a sq ft new or replacement; overlays $1 - $3 a sq ft · full pricing guide

Base design is where this area differs from milder places. HomeGuide's figures call for 2 to 3 inches of rolled asphalt on a 6 to 8 inch gravel base for an ordinary home drive, and for heavier loads, 3 to 4 inches of asphalt on 8 to 10 inches of base. The city's deck handout puts the frost line at 52 inches and Minnesota's rule sets footings five feet down in Clay County, so no driveway base reaches below frost. A thicker base instead spreads wheel loads over a subgrade that softens every spring. The soil series named for the city drains very slowly and can hold a water table at the surface, and Fixr adds about $2 a square foot for a heavier base where soils are unfavorable. A geotextile fabric over wet clay and a crown that sheds water off the edges are both worth discussing.

Permits depend on the city and on whether the work touches the street. In Moorhead, a permit is required to install a driveway approach, sidewalk or curb and gutter in the public right-of-way; it costs $60 and is issued only to a contractor with a bond on file or a homeowner who posts a $10,000 bond and shows proof of insurance. West Fargo's code says no one may construct, reconstruct or repair a driveway without a license from the City Auditor, and sets residential driveways at 6 inches thick and at least 9 feet wide at the sidewalk line. Horace publishes driveway standards that draw the residential approach as 6-inch concrete, 9 to 30 feet wide. In Fargo, excavation permits for right-of-way work come from the Engineering Department, the office to check with before a new or widened curb opening is cut.

The paving season is short. Angi notes that asphalt dries and cures well between 50 and 85 degrees, and Hector's normal highs sit inside that band from May, at 69.3, through September, at 70.8, with April and October at about 56 on the cool edge. Hot mix loses heat quickly on a cold base, so compaction suffers early in spring and again in late fall. The frost also has to be out of the ground and the subgrade firm before any base goes in, which in a wet spring can push a May start into June.

Not every worn drive needs tearing out. In HomeGuide's terms, a 1.5 to 2 inch layer of fresh asphalt over the old one suits a drive younger than 15 to 20 years whose foundation is sound and whose surface damage stays under 30 percent. Past 20 to 30 years, or with cracking over 60 percent of the pavement, replacement is the call. Overlays run $1 to $3 a square foot there, and a resurfaced drive lasts 8 to 15 years. An overlay laid on a heaving, waterlogged base simply lets the old cracks work up through the new layer.

New asphalt should not be sealed right away. SealMaster's floor is 30 to 60 days of curing, Angi's guidance runs from 30 days to three months, and HomeGuide recommends waiting around a year, so a drive paved in July or August is better sealed the following summer. Angi says vehicles can use new asphalt after about three days, with no sharp turns while it hardens. On price, HomeGuide puts a new asphalt drive at $5 to $12 and up a square foot, Fixr at $7 to $15, and Angi quotes $8 to $15 to replace one; repair costs sit alongside those on the cost page.

Free quote

Fields marked * are required.

Fast response during business hours. No obligation.

Signs a driveway is past sealing and patching

Sealer and patches extend the life of sound pavement. These conditions mean the pavement is no longer sound and an overlay or replacement is the next step.

  • Cracks cover most of the surface, not just a few straight lines
  • The drive heaves or sinks in the same places every spring
  • Patches from past years are failing next to newer ones
  • Water pools against the garage or runs toward the house
  • Large areas have broken into small plates that shift underfoot
  • Two or three decades have passed without an overlay

One of these can be a local repair. Several together mean the money is better spent on an overlay or a new drive than on another coat.

Overlay, replacement or a rebuilt base

The choice turns on the base. A sound base can take a new surface; a failing one has to be rebuilt first.

Overlay the old surface

Sound base, surface damage under 30 percent, and a drive younger than 15 to 20 years. Repair the failed spots, then lay 1.5 to 2 inches of fresh asphalt over the old surface.

Tear out and replace

Cracking across 60 percent or more of the surface, or asphalt that has reached 20 to 30 years. Remove the old mat, correct the grade, recompact or add base, and pave new.

Rebuild base and drainage

The same areas heave or settle every year. Dig past the soft clay, add a thicker base over geotextile, regrade so water leaves the pavement, and move downspouts before any new asphalt goes down.

Questions

Asphalt Paving FAQs

Can an asphalt driveway be paved in October around Fargo?

Sometimes, early in the month and on a dry base, but it is a compromise. October's normal high at Hector is about 56 degrees, the cool edge of the 50 to 85 degree range where asphalt cures comfortably, and the month averages about 12 nights at or below freezing. Mix cools faster on a cold base, which makes compaction harder. A drive paved then also cannot be sealed until the following summer, so a May or June start is usually the better plan.

What should a paving contractor's quote spell out?

The excavation depth, the base material and its compacted thickness, the asphalt thickness after rolling, and how the surface will be graded to shed water away from the garage and the house. It should also say who pulls any permit for work at the street, how the edges will be finished, what happens to the old material, and when the drive can be driven on and first sealed. Two quotes that list these items can be compared line by line.

Will a new driveway heave the way the old one did?

Not if the cause is fixed. Heave comes from ice forming in wet, frost-susceptible soil, and no driveway base reaches below a 52-inch frost line, so the fix lies in keeping water from collecting in the ground under the drive. That means a thicker, well-drained gravel base, a geotextile over soft clay where needed, a crown or slope that sheds water to the edges, and downspouts and snow storage kept away from the pavement.